LYRA

Project Details

Lyra is in the Department of Antioquia, 120km northwest of Medellín, and a two hour drive from the city. The Lyra project comprises in 14 concession contract applications totaling 54,895 hectares covering more than 25km of the Tonusco Fault that extends south from the Buriticá vein system.

Data available from Ingeominas (Instituto Colombiano de Geología y Minería) shows 50 of 61 of their samples on Lyra are non-detectable to 0.3 g Au/t, 11 samples are greater than 0.3 g Au/t, and 6 of those 11 samples greater than 1 g Au/t.

Miranda infers that the Tonusco Fault is a feeder to the Buriticá vein system and that Lyra may offer an extension to the Buriticá district and additional similar vein systems may occur along the Tonusco Fault on Lyra.